SPRL is seeking the following changes to the approved scheme:

  • Increase the total number of new homes from up to 1,300 to 1,500
  • Delivery of 20% affordable housing including social rent and shared ownership
  • Reduce the maximum commercial floorspace from 37,500 sqm to 20,000 sqm GIA (Gross Internal Area)
  • Change the position of Blocks B and C
  • Reduce the size of the Pavilion building (Block E)
  • Increase and decrease the heights of Blocks B, C and D
  • Introduce a new east-west route through Block B
  • Retain the HMV Empire Building that was previously due for demolition

Homes

We are proposing to increase the number of homes from 1,300 to 1,500.
This will include:
  • A range of tenures including private, affordable and build to rent
  • 20% affordable homes or which 60% will be social rent and 40% shared ownership
  • A range of studio. 1 bed. 2 bed and 3 bed homes
schemes

Commercial space

The proposals will reduce the amount of commercial Floorspace from a maximum of 37,500 sqm to 20,000 sqm. We are making this change because:
  • There is less demand for larger stores
  • Covid-19 has changed shopping habits with more online shopping
  • Shopping experiences are changing in city centres with demand for a wide variety of products, services, events and experiences which aren't available online


The amount or active frontage at ground floor level will remain similar to the approved scheme. There will be a range of smaller retail and leisure spaces including a smaller pavilion building and space for a medical centre

approved 2022 scheme
emerging scheme

Footprint of Blocks

We are proposing to change the position of some of the Blocks to create a more intimate and varied street pattern across the site:
  • Block B will move further south by 7.5m
  • Block C will move further north by 24m
  • Block E will align with Coventry Retail Market and Christchurch Spire
  • Minor changes to the position of Blocks A1 and A
block footprint
emerging block footprint

Height of Blocks

We are proposing to increase and decrease the heights of some of the blocks to create a more varied skyline whilst respecting key views into the city centre. The key changes are:
  • Block B will increase by approximately 4 storeys along Market Way and 3 storeys on Hertford Street
  • Block B will reduce by approximately 8 storeys on the northern boundary behind Upper Precinct
  • Block C will increase by approximately 4 storeys on its western side
  • Block D will increased by approximately 2 storeys on Queen Victoria Street

These changes remain consistent with the principles for where taller buildings should be located across the Site.

Height of Blocks plan1
Height of Blocks plan2

Height of Blocks

We are proposing to increase and decrease the heights of some of the blocks to create a more varied skyline whilst respecting key views into the city centre. The key changes are:
  • Block B will increase by approximately 4 storeys along Market Way and 3 storeys on Hertford Street
  • Block B will reduce by approximately 8 storeys on the northern boundary behind Upper Precinct
  • Block C will increase by approximately 4 storeys on its western side
  • Block D will increased by approximately 2 storeys on Queen Victoria Street

These changes remain consistent with the principles for where taller buildings should be located across the Site.

Height of Blocks plan1
Height of Blocks plan2

Connectivity

City Centre South will continue to create new pedestrian friendly routes that connect key destinations within the city including to Coventry Retail Market, Coventry University and the train station. We are looking at opportunities:
  • For a new route through Block B and creating different street patterns and widths.
  • To improving the levels and access along Hertford Street
  • To enhance the pedestrian experience around Coventry Retail Market
connectivity map
connectivity map emerging

Public spaces

Our intention is to find opportunities to increase the amount of publicly accessible green spaces where people can sit, relax and enjoy. Our emerging proposals:
  • Include a new public space at the heart of the site by Coventry Retail Market
  • Integrate with the public space opposite the Methodist Central Hall
  • Improve the route on Hertford Street
  • Plant new trees across the site
public square

Culture and Public Art

A key change to the proposals is the retention of the HMV Empire Building, previously due for demolition.

We want to honour Coventry's recent City of Culture status and celebrate the varied heritage and cultural assets and public art which sit within the site. We have appointed a specialist culture and public art consultant to explore innovative ways of doing this.

coventry market

The emerging proposals remain consistent with the scale and ambition this regeneration project needs, providing

compass
New homes

Unto 1,500 new homes including a range of sizes and tenures including private for sale. private for rent and affordable homes (social rent and shared ownership).

wellbeing
Shops

A variety of new commercial space for a modern shopping experience including a smaller pavilion building.

compass
Culture and leisure

New leisure facilities which could include cafés, bars, restaurants or spaces for competitive socialising.

wellbeing
Public realm

Creating new outdoor recreation spaces for people to dwell and relax, new children’s playspace and provision of health facilities.

compass
Community uses

Space allocated for community facilities like a medical centre, helping to accommodate the needs of the local population.

wellbeing
Wider economic and social benefits

Construction jobs being created across the duration of the project, new job opportunities once built, and increased spending in the city centre with the new resident population.

compass
The Empire

The retention of the HMV Empire Building which was previously due to be demolished.

Please get in touch

Contact us